7. If A and B can do a work in 10 days , B and C can do it in 20 days and C and A can do it in 40 days in what time all the three can do it?
A.50/7 B.80/7
C.8/7 D.15/7
Answer:
A+B = 1/10
B+C = 1/20
C+A = 1/40
Adding all the three we get 2(A+B+C) = 7/40 => A+B+C = 7/80 => No of days = 80/7 days.